Design me a Product
$10-250 USD
Paid on delivery
1.0 Objective
To develop a facility layout for the manufacture of a selected LIFTING JACK
2.0 Constraints
In addition to environmental and safety constraints, the following goals listed in order of priority
are to be considered:
• Investing no more than AED 1000,000 millions for purchasing equipment
• Meeting demand of 5000 units/year
3.0 Assumptions
• Facility efficiency: 90%
• Number of working days per year = 300
• Work shifts: one 8-hour shift per day
• Make other necessary assumptions
4.0 Information Gathering
It is the responsibility of each team to search for and gather the information necessary for designing a layout for a facility that efficiently produces the desired quantities of the selected jack. This may involve contacting raw material and equipment suppliers to obtain details about machine capacities, material handling devices, equipment costs, equipment dimensions, and manufacturing process data. In addition to equipment and machine costs, it is necessary to determine the cost of labour for all activities. The salaries and hourly rates paid for personnel in the proposed plant should correspond to averages currently paid for similar positions in the UAE.
5.0 Project Report
The report should be organized as follows:
• Abstract
• Introduction
• Product, Process, and Schedule Design
• Flow, Space, and Activity Relationships
• Personnel Requirements
• Material Handling
• Layout
• Cost Estimation
• References
I'M LOOKING FOR A FLEXIBLE PRICE BECAUSE I'M STILL STUDENT , NO MORE THAN 300 USD
Project ID: #5506595