I need to provide an assessment of the uncertainty and risk which surrounds a project similar to Eurotunnel (An Introduction of that would be given to the coder). Risk identification should adopt a PEST classification and subsequent analysis of economic factors must be subject to Monte Carlo simulation (and discuss the implications arising from the analysis). You will need to make a summary of the introduction I will send.
## Deliverables
1) Complete project ASAP. 2) You will need to provide me with references, the Harvard System, and these should be at least 4. 3) You will need to give me an Introduction of the work I will send you, the Main Subject, a conclusion, Appendices (diagramms and/ or tables where appropriate) a possible Glossary, References and Bibliography, and you will need to write the report in English.
## Platform
Risk identification should adopt a PEST classification and subsequent analysis of economic factors must be subject to Monte Carlo simulation. It will be necessary you have economics, business, management or project management knowledge.
## Deadline information
The document should not exceed 1900 words, and Introduction should not exceed 2 pages A4 in single format. It needs to be delivered as a Word Format.