Hi.
I have about 30 reports that need to be made. I am a Crystal Report writer, so I have a good idea how long this will take. I have a project manager that will assist you with tracking the reports.
I have a well-normalized database and can detail exactly how everything works.
I also have very detailed requirements documents.
Most reports should be able to be built in 10-15 minutes.