Good Afternoon,
To give you a better understanding of the requirements, please see below - there are a significant number of documents that show the actual requirements
If you think this is something you can assist with (time is in short supply for this task, I’m sorry) we would love to hear from you.
Description of work being done:
For new (mainly residential) developments, all power to the sites will be connected via underground cabling.
The company will be responsible for taking the power connection from the existing power lines from the street power poles to the property line of the new development.
To achieve they will:
• Dig a trench from the power pole to the property line.
• Install conduit in the trench
• Pull cabling through the conduit
• Dress the power pole in the trench at the property line
• Back fill the trench and clean up the site
Technical writing requirements are as follows (relevant documentation is attached to this email).
HSE 2022 Questionnaire and SNNS
Please complete as follows:
Part A, B & C of Vendor HSEQ Questionnaire Form (attached in email)
1. Section 1 bypass
2. Section 2 Where the vendor selects a Yes, the vendor must provide evidence to confirm. This can be a HSE Plan, relevant procedure etc.
3. Section 3, if the vendor provides a training matrix or similar: if any fatalities, OHS prosecutions, notices etc have been referenced by the vendor provide a summary of date and details, and frequency rates
4. Section 4 (A) is the SWMS review, refer to the dot above, also if the vendor will be subcontracting work for us, we need detail of how they review/assess subcontractor suitability.
Scope of Works (SOW) and Schedule of Rates (SOR) for both networks’ pricing (refresh for JEN)
The budget for this task is negotiable.
Good Day!!!
I am kamal , I am an Experienced Civil Engineer in an overall 18 years experience in Architect who are indulged in Architectural services, planning, 3d visualization, interiors and landscaping. I have experience in field and have immense hold on detail working of projects. I have expertise in Esta2020 for preparing Estimation, BOQ, AutoCAD, Revit Architecture, 3ds max and Encape with vray render of views along with Photoshop editing. We provide detail Architectural drawings of projects and have experience. Time bound with quality of work is my motto. I believe in long term relation development to provide services in the future too.
Presently I am working 60Cr (INR) building project.
I have experience in developing Scope of work, Materials Take off (MTO) etc. And Schedule of Rate (SOR) for the works. And I can include SWMS for the scope. I am familiar with Australian Standards. And have worked with different Australian companies operating in Papua New Guinea and have work experience in scoping, SWMS, SOR, MTO etc. I am sure to do execute deliverables. I am open for further discussion for this kind of task.
Hi
Greetings!
I am available right now for the project discussion and can start the project
on an immediate basis. I have understood your project requirement
I have7++ experience in design and development. I can handle projects from small
styling to full development from scratch. I will provide a good result in a short time
and satisfy you fully.
We have experienced developers in
Construction Engineering
Drilling Engineering
WHY-ME:
» Ready to Start as Immediate& Proper Testing.
» Keep your Data & Website Secure: Daily Progress Updates.
» You will get 30-days FREE BUG-SUPPORT even after Project-Completion
Please give me in touch and let's discuss more detail about your task via chat.
Project milestones will be decided during chat
Thanks and Regards
Arpit Jain
Black Grapes Softech