This problem is project size optimization problem. It has two parts.
1. Monthly flow of river will be given for 12 months for 10 years. You have to write a program in genetic algorithm to calculate optimum Hydro project size (all formulas will be given) so as to produce maximum amount of energy for cost. Repeat it for Wind Turbine.
2. You have X number of projects like No 1( Wind, river Hydro, Storage Hydro and thermal). What is best combination of running these projects for given load? (Assuming least cost and least immission).
These are simple program for experienced people. Knowledge of Matlab and Genetic Algorithm or Fuzzy logic is must. If you can send me example of your past work, it will be helpful.
hi, i can surely help. i have alot of experience with implementation of genetic algorithm for different real life optimization problems, you can check my profile.
looking forward for your reply.
Hi, I would like to work with you. And I will come up with the new genetic algorithm design. Please see your personal inbox for the Design Proposal. Thanks!