I am an electrical Engineer,
have a good hands on experience on many projects like :
• EPC for Bab Far North CO2 Injection Pilot Project (Injection of CO2 in 4 wells 1046, 1053, 1054, 1055 and production of crude oil from 1051 & 1052).from Rumaitha to BAB, Abu Dhabi, UAE
• BAB CDS shut down project (installation of ESD panels in BCDS) at Habshan field, Abu Dhabi.
• Dismantling and installation of 403 and 485 gas wells at Habshan field, Abu Dhabi
• Pre-commissioning/commissioning of WHCP for 981, 983, 955, 954 production/injection wells.
• Cathodic Protection of 983, 955 gas well pipeline at Habshan field, Abu Dhabi.
• Industrial Wiring, Lightning, DB/SMDBs installation and all Electrical related works at ETP plant at Uttam Galva steel plant, Khopoli, Maharashtra, India.
I can give You the better reply incomparison to others and also I can can give you off for your next query.