Draw the Gantt chart and calculate the waiting time and response time.

CPU scheduling with non-preemptive and preemptive separately: Multilevel Feedback Queue with three levels:

1. The first level is RR at 8 units

2. The second level is RR at 16 units

3. The third level is FCFS

Below are the processes in the system: