make a modern architectural design/plan for a 3 bedroom 2 story house with a pool sitting on a 300 square meter lot.

  • Status: Pending
  • Prize: $200
  • Entries Received: 28

Contest Brief

Make a modern architectural design/plan and 3D rendering for a three bedroom two story house sitting on a 300 square meter lot.

"Lot layout and dimensions are attached"

The house must have the following:

- A lot of natural
- A swimming pool
- 3 bedroom
- 3 bathroom
- 1 office space
- A rooftop

Note: Keep in mind while designing this house that it will be in tropical areas temperatures are very hot. So try to imagine ways to keep air flow and coolness around the home.
Also I want to maximize the outdoor space.

Recommended Skills

Top entries from this contest

View More Entries

Public Clarification Board

  • MichaelbyUA
    MichaelbyUA
    • 10 months ago

    Administration of this website are rogues. They bannered that they guaranteed to pay the prize, so they must pay. Rogues, you must pay!

    • 10 months ago
  • Rendesign
    Rendesign
    • 1 year ago

    Contest Holder, can you at least upload a goolge earth location to have an idea of the plot shape, in that way we can be a little more precise about our entries.
    Also, can you guarantee that you will hold the contest until the time you stablished is complete?

    The comunity will apreciate a response from you have a good day.

    • 1 year ago
    1. MichaelbyUA
      MichaelbyUA
      • 11 months ago

      You were right to assume that anonymous contest holders are malicious. They're either crooks, mentally ill, or boorish pigs who entertain themselves with boorishness. And this anonymous “Texan” from the African shithole-country Senegal, this “Abdou N. @abniang4”, is more proof of that.

      • 11 months ago
    2. MichaelbyUA
      MichaelbyUA
      • 11 months ago

      The only thing you were incorrect about was that you thought this site would protect freelancers from crooks. The crook in Senegal got a few product options that matched the crook's pre-requisites. The screenshots of the project are completely sufficient for further applications. The file handover is completely unimportant in this case. But the freelancers, who have done the work for the crook, have got no payment from the crook. This site does not guarantee freelancers anything.

      • 11 months ago
  • fahimeh22
    fahimeh22
    • 1 year ago

    please check #69

    • 1 year ago
  • santohusain49
    santohusain49
    • 1 year ago

    Please check my entry #64 , contains floor plan and 3D rendering, Thank you

    • 1 year ago
  • SsArchInt
    SsArchInt
    • 1 year ago

    Please check #51, #61

    • 1 year ago
  • roroARCHI
    roroARCHI
    • 1 year ago

    Is the garage required? for how many cars
    The office can be on the 1st floor or must be on the ground floor?

    • 1 year ago
  • Abujudy20085
    Abujudy20085
    • 1 year ago

    Failed to download and enter the charts because my account on freelancer is incomplete. I am very sorry. I have completed the identification information, and the freelancer website has sent a message that it will be reviewed within four days. I will send the charts after the site allows me to do so. Thank you, my dear brother

    • 1 year ago
    1. abniang4
      Contest Holder
      • 1 year ago

      Thank you Ali. No problem i will be waiting for your design

      • 1 year ago
    2. Abujudy20085
      Abujudy20085
      • 1 year ago

      Thank you

      • 1 year ago
  • Abujudy20085
    Abujudy20085
    • 1 year ago

    I present to you a house design that meets all the required requirements. The design was made on the land on which the design is required. The design is distinguished by the ground floor set back from the second floor to provide misleading and cool areas around the building in all directions. The building is ventilated from all sides. The swimming pool area was signed at the back of the building to provide privacy. The project is designed to suit the customs and traditions of the region, and the design is characterized by the presence of a double day at the entrance to the pool towards the north, which will help the movement of air to the second floor floor, and the design of green areas around the building at the entrances to the building and on the eastern, western and northern sides, hoping that it will be accepted.

    • 1 year ago
  • abniang4
    Contest Holder
    • 1 year ago

    I have uploaded another document that shows the lot positioning (lot 12) . I hope it helps

    • 1 year ago
    1. MFamilyGroup
      MFamilyGroup
      • 1 year ago

      thanks, but can you upload more clear pictures because your pictures still blurry.

      • 1 year ago
  • abniang4
    Contest Holder
    • 1 year ago

    I see some complaints about my account not being verified. Can someone please tell me what do i need to do to have it verified?

    I have numerous contests here and never had such complaints.

    • 1 year ago
    1. Rendesign
      Rendesign
      • 1 year ago

      i had contact with freelancer support and they told i wont be any trouble, all is fine at this moment.

      • 1 year ago
  • elliesuh90
    elliesuh90
    • 1 year ago

    Hello, are there setbacks for the lot ??

    • 1 year ago
    1. abniang4
      Contest Holder
      • 1 year ago

      no

      • 1 year ago
  • aja55d5a832846d2
    aja55d5a832846d2
    • 1 year ago

    #increaseprize

    • 1 year ago
  • tatysmithv
    tatysmithv
    • 1 year ago

    #increaseprize #increaseprize #increaseprize

    • 1 year ago
  • bebo1979tayson
    bebo1979tayson
    • 1 year ago

    Dear Contest Holder please note that all deliverables will be in different dimension for all entries while you didn't give us at least diagonal measurement and angels. all drawings will not be correct and not matching the site condition during execution stage.

    • 1 year ago
  • izadea
    izadea
    • 1 year ago

    #increaseprize

    • 1 year ago
  • badriahsara
    badriahsara
    • 1 year ago

    #increaseprize #increaseprize

    • 1 year ago
  • ImtRanchi
    ImtRanchi
    • 1 year ago

    #sealed #increaseprize

    • 1 year ago
  • SsArchInt
    SsArchInt
    • 1 year ago

    #increaseprize

    • 1 year ago
  • engrmoynul23
    engrmoynul23
    • 1 year ago

    Dear Sir, Proper survey report of the project must be required while starting the work of your project. Since the measurements of the four sides of your project area are not regular.

    • 1 year ago
  • agungwm2313
    agungwm2313
    • 1 year ago

    #increaseprize #increaseprize

    • 1 year ago
  • abdolshahisaba
    abdolshahisaba
    • 1 year ago

    I guess its a new policy .. I run for my prize money and beg clients to verify and they don't because it need their information. If you dont want to verify its just wasting time for designers.

    • 1 year ago
  • abdolshahisaba
    abdolshahisaba
    • 1 year ago

    Dear client
    Please verify your account at first. I won 2 competition and the sit has blocked my prize because my clients have not verified their accounts. If you are not going to verify your account your money is not going to reach the winner. Its just freezing in account.

    • 1 year ago
  • corvicenti
    corvicenti
    • 1 year ago

    Dear contest holder, do you want the house with 1 storey or 2 storeys?

    • 1 year ago
  • Draftman07
    Draftman07
    • 1 year ago

    #increaseprize

    • 1 year ago

Show more comments

How to get started with contests

  • Post your contest

    Post Your Contest Quick and easy

  • Get tons of entries

    Get Tons of Entries From around the world

  • Award the best entry

    Award the best entry Download the files - Easy!

Post a Contest Now or Join us Today!