Dear Sir,
Please have a look my profilee.
EX: Permission by the Engineer to proceed does not constitute acceptance or approval of executed work, design, details, calculations, analysis, test method or material developed or selected by the Contractor and does not release Contractor from any of his liabilities under the Contract and from full compliance with contractual obligations and does not constitute any change to Contract Documents